HOLCIM SCADA UPGRADE

REQUIREMENTS OF THE CUSTOMER:

•Full SCADA renovation for the Power Plant, replacing the old system and including new features.

•To supply and commission the new system.

•Replacement of old S7-400 PLC with new S7-400H, Redundant.

BENEFIT OF THE CUSTOMER:

•Siemens automation system used was based on Simatic S7-400H, Which will eliminate shut downtime and provide high availability.

•Individual computers were used, with the new system the database is centralized.

•It is possible to reduce operational costs, as the system is fully automated and doesn’t require any personal intervention, reports are generated automatically.

•It is possible to reduce maintenance costs, by using the highest product quality, fault detection, and event logging that allows tracing problems causes. Most of the analog signals are archived.

IMPLEMENTATION:

•To deliver a full control and monitoring system.

•Continuous Support and availability guaranteed know-how to be provided by the SP.

Product Quality, full integration, easy to configure.

Download PDF 

For any inquiry or support, please contact us at support@automationmate.com

Leave a Reply

Your email address will not be published. Required fields are marked *